Tenant fit-out • Kingston, ON • 2024

Large office retrofit / fit-out

Retrofit and fit-out of approximately 30,000 ft²; HVAC and plumbing/drainage systems removed back to their respective mains, with full re-design and coordinated permit documentation.

Building sectors and occupancy types

Mechanical consulting for Dupont Canada with base-building and tenant distribution scope defined from mains onward.

Latest projects

See all projects

HVAC retrofit

Air handler and chiller retrofit

Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.

View project

Etobicoke, ON 2026

Mechanical retrofit

Chiller retrofit — St. Clair West

Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.

View project

Toronto, ON 2025

Mechanical — speciality fluid systems

Aircraft Hangar Waste Oil Recovery System

This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.

View project

Airport Rd., Bay 9