our work
A selection of projects delivered across residential and commercial sectors
Explore completed projects showcasing our approach to planning, execution, and build quality — across a range of scales and requirements.
HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
View project
HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
Etobicoke, ON 2026
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
View project
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
Toronto, ON 2025
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
View project
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
Airport Rd., Bay 9
Mechanical — air handling & water-cooled refrigeration
Air Handler and Chiller Retrofit Project
This project involved the replacement of an existing 40-ton water-cooled compressor/chiller, a 20,000 CFM air handling unit, and the condenser water pump.
View project
Mechanical — air handling & water-cooled refrigeration
Air Handler and Chiller Retrofit Project
This project involved the replacement of an existing 40-ton water-cooled compressor/chiller, a 20,000 CFM air handling unit, and the condenser water pump.
1 Greensboro Rd., Etobicoke, ON
Mechanical — heating & domestic hot water
Boiler Plant Retrofit Project
This project involved the replacement of the existing boiler plant of 1,000 MBH capacity. The design decoupled the domestic hot water system from the heating plant for energy savings in summer when heat is off. Both systems used primary-secondary configuration to decouple system pumps.
View project
Mechanical — heating & domestic hot water
Boiler Plant Retrofit Project
This project involved the replacement of the existing boiler plant of 1,000 MBH capacity. The design decoupled the domestic hot water system from the heating plant for energy savings in summer when heat is off. Both systems used primary-secondary configuration to decouple system pumps.
40 St. Clair W., Toronto, ON
Mechanical — central plant & HVAC
Chiller Retrofit Project
This project involved the replacement of an existing 800-ton chiller with two new magnetic-bearing chillers. The chillers were configured in a primary-secondary loop system; condenser and evaporator pumps were replaced with duty/standby equipment. The design included refrigerant leak detection and an associated purge exhaust system.
View project
Mechanical — central plant & HVAC
Chiller Retrofit Project
This project involved the replacement of an existing 800-ton chiller with two new magnetic-bearing chillers. The chillers were configured in a primary-secondary loop system; condenser and evaporator pumps were replaced with duty/standby equipment. The design included refrigerant leak detection and an associated purge exhaust system.
2 St. Clair W., Toronto, ON
Mechanical — tenant / base building fit-out
Large Office Retrofit/Fitout
This project involved the retrofit and fit-out of an existing office of approximately 30,000 ft². HVAC and plumbing/drainage systems were removed back to their respective mains, and new design was provided.
View project
Mechanical — tenant / base building fit-out
Large Office Retrofit/Fitout
This project involved the retrofit and fit-out of an existing office of approximately 30,000 ft². HVAC and plumbing/drainage systems were removed back to their respective mains, and new design was provided.
505 Front Rd., Kingston, ON
Heating & DHW
Boiler plant retrofit
Replacement of a 1,000 MBH heating plant with domestic hot water decoupled for seasonal savings, and primary–secondary pumping on heating and DHW circuits.
View project
Heating & DHW
Boiler plant retrofit
Replacement of a 1,000 MBH heating plant with domestic hot water decoupled for seasonal savings, and primary–secondary pumping on heating and DHW circuits.
Toronto, ON 2024
Tenant fit-out
Large office retrofit / fit-out
Retrofit and fit-out of approximately 30,000 ft²; HVAC and plumbing/drainage systems removed back to their respective mains, with full re-design and coordinated permit documentation.
View project
Tenant fit-out
Large office retrofit / fit-out
Retrofit and fit-out of approximately 30,000 ft²; HVAC and plumbing/drainage systems removed back to their respective mains, with full re-design and coordinated permit documentation.
Kingston, ON 2024