Mechanical — speciality fluid systems • Airport Rd., Bay 9

Aircraft Hangar Waste Oil Recovery System

This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.

Mechanical room with piping, ducts, and building services equipment.

Latest projects

See all projects

HVAC retrofit

Air handler and chiller retrofit

Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.

View project

Etobicoke, ON 2026

Mechanical retrofit

Chiller retrofit — St. Clair West

Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.

View project

Toronto, ON 2025

Mechanical — air handling & water-cooled refrigeration

Air Handler and Chiller Retrofit Project

This project involved the replacement of an existing 40-ton water-cooled compressor/chiller, a 20,000 CFM air handling unit, and the condenser water pump.

View project

1 Greensboro Rd., Etobicoke, ON