Mechanical — tenant / base building fit-out • 505 Front Rd., Kingston, ON
Large Office Retrofit/Fitout
This project involved the retrofit and fit-out of an existing office of approximately 30,000 ft². HVAC and plumbing/drainage systems were removed back to their respective mains, and new design was provided.
Gallery
Latest projects
See all projects HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
View project
HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
Etobicoke, ON 2026
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
View project
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
Toronto, ON 2025
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
View project
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
Airport Rd., Bay 9