Heating & DHW • Toronto, ON • 2024
Boiler plant retrofit
Replacement of a 1,000 MBH heating plant with domestic hot water decoupled for seasonal savings, and primary–secondary pumping on heating and DHW circuits.
Gallery
Latest projects
See all projects HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
View project
HVAC retrofit
Air handler and chiller retrofit
Replacement of a 40-ton water-cooled chiller package, a 20,000 CFM air-handling unit, and the condenser water pump—coordinated for minimal downtime and clear commissioning boundaries.
Etobicoke, ON 2026
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
View project
Mechanical retrofit
Chiller retrofit — St. Clair West
Replacement of an 800-ton legacy chiller with two magnetic-bearing machines in a primary–secondary loop, with condenser and evaporator pumps upgraded to duty/standby and refrigerant leak detection plus purge exhaust.
Toronto, ON 2025
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
View project
Mechanical — speciality fluid systems
Aircraft Hangar Waste Oil Recovery System
This project involved the design and specification of a waste oil recovery system. Major components included a diaphragm pump, level detection with alarm, and a 2,200 L waste oil tank.
Airport Rd., Bay 9